The production capacity of PDAM
Jember is limited when compared to the population in
service area, and their water needs (estimated at 125
to 175 l per person per day). The existing water supply
system is supported by 26 production units, which are
listed in order of descending production cost:
1. Water treatment process (WTP): 2 unit
2. Boreholes: 15 units
3. Surface water intakes: 2 units
4. Gravity systems: 7 units
Chemical material use for production
activities are:
1. Alum to water treatment (sedimentation)
2. Chlor to desinfection
Water is being transmitted in two ways: gravitation
and pumping from production units to distribution systems
through pipes with a diameter ranging from 25 to 350
mm (DCI, ACP, CIP and PVC). Four reservoirs are available
to maintain supply to the administrative town of Jember,
the main service area of the PDAM:
• 2 units with a capacity of
1,500 m3;
• 1 unit with a capacity of 750 m3; and
• 1 unit with a capacity of 300 m3.
A distribution system is in place to
service over 20,000 connections. At present, the PDAM
covers the town of Jember, and the districts of Rambipuji,
Mumbulsari, mangli, Wirolegi, Tanggul, Puger, and Jelbuk.
For a selection of summary statistics, map of city zone
area, table of production capacity, click
here.