Investment Plans
(a) Rehabilitation and improvement and the distribution network (from main pipes to tertiary pipes for reticulation) in connection with road widening, and also including corroded pipes (GIP and asbestos).
(b) Water meter replacement (of meters with a technical life exceeding four years); a total of 20,000 units will be replaced, not excluding connections to government agencies.
(c) Construction of 300mm parallel transmission mains over a length of 4 km.
(d) Construction of an additional floor in the head office (from 1 to 2 floors).
(e) Procurement of 10 two- or three-wheel vehicles for the Emergency Call Unit.
(f) Revitalization of the intake at Broni to anticipate operations in the dry season.
(g) Improvement of the radio communication system (trunking system).

Other Planned Activities
(a) Cooperation with the LGWS programs.
(b) Cooperation with the World Bank (development and rehabilitation of water supply systems).
(c) Rescheduling and restructuring of long-term debts.

Private Sector Participation (PSP)
At present, a feasibility study is undertaken with private sector parties to contract out the O&M activities of all production units, and to development new treatment plants under a BOT-scheme with PT. Novco and PT. BTSM Jakarta.

 
     
 